Installing solar panels is an excellent way to reduce energy costs and environmental impact. California's streamlined solar permitting process makes it easier than ever, but understanding requirements ensures smooth installation.
California Solar Mandate
As of 2020, California requires solar panels on most new homes. For existing homes, solar remains optional but highly incentivized through:
- Net Energy Metering (NEM) programs
- Federal tax credits (30% through 2032)
- State and local rebates
- Property tax exemptions
Permit Requirements
Building Permit
Required for all solar installations, covering:
- Structural analysis of roof
- Mounting system specifications
- Wind and seismic calculations
- Fire safety setbacks
Electrical Permit
Ensures safe electrical connections:
- DC and AC wiring
- Inverter installation
- Grounding systems
- Main panel upgrades if needed
- Interconnection equipment
Streamlined Permitting
SolarAPP+
Many California jurisdictions use automated permitting:
- Instant approval for standard systems
- Reduced fees
- Same-day inspections
- Online submission
Standard Plan Requirements
- Site plan with array layout
- Single-line electrical diagram
- Equipment specification sheets
- Structural attachments details
Code Requirements
Fire Safety Setbacks
- 3-foot pathways on residential roofs
- Ridge setback requirements
- Access paths to roof areas
- Valley and hip setbacks
Electrical Code Compliance
- Rapid shutdown devices required
- Arc fault protection for DC circuits
- Proper grounding and bonding
- Correct wire sizing and protection
- Accessible disconnect switches
Structural Requirements
- Roof must support additional 4 lbs/sq ft
- Proper flashing at penetrations
- Engineered mounting systems
- Wind uplift resistance
Interconnection Process
Utility Application
Separate from building permits:
- Submit interconnection application
- Receive Permission to Operate (PTO)
- Schedule meter installation
- Begin net metering
Required Documentation
- Electrical single-line diagram
- Manufacturer cut sheets
- Signed interconnection agreement
- Proof of insurance
Common Installation Issues
Avoid These Violations
- Inadequate grounding systems
- Missing rapid shutdown devices
- Improper roof penetrations
- Incorrect fire safety setbacks
- Undersized electrical components
Cost Breakdown
Permit Fees
- Building permit: $250-$500
- Electrical permit: $100-$300
- Plan check: $150-$400
- Total permits: $500-$1,200
System Costs
- Residential system (6kW): $15,000-$20,000
- After federal credit: $10,500-$14,000
- Cost per watt: $2.50-$3.50
- Payback period: 5-8 years typically
Battery Storage Considerations
Adding batteries requires additional permits:
- Separate electrical permit
- Ventilation requirements
- Fire safety clearances
- Working space requirements
HOA Considerations
California Solar Rights Act protects homeowners:
- HOAs cannot prohibit solar installations
- Restrictions must not increase costs by $1,000+
- Cannot reduce system efficiency by 10%+
- Approval must be provided within 45 days
Tips for Success
- Use licensed C-46 or C-10 contractors
- Get multiple quotes
- Verify contractor pulls all permits
- Understand your utility's net metering rules
- Consider future electrical needs
- Research all available incentives
"The permit process was much simpler than expected. Our city uses online permitting, and we had approval within 24 hours. The investment has already reduced our electric bills by 90%."
- David K., San Diego Homeowner
Solar installation represents a significant investment in your home's value and energy independence. Proper permitting ensures safe installation and protects your investment for decades of clean energy production.